⌘K
KS
Operations · Module

Inventory & Distribution

5 warehouses · ABC/XYZ classification · Auto-replenishment · Route optimization

Stock Sentinel · 12 auto-actions today
Inventory value
฿2,830 M
-2.1%
Stock turns
6.4x
+0.3
Stockout risk SKUs
14
-6
Slow movers > 180d
฿98 M
-฿12 M

Warehouse Heatmap

Capacity utilization

WH-Lat Krabang (HQ)฿1240M
4,820 SKUs
92% capacity
WH-Chachoengsao฿680M
2,140 SKUs
78% capacity
WH-Khon Kaen฿420M
1,320 SKUs
64% capacity
WH-Surat Thani฿310M
980 SKUs
58% capacity
WH-Chiang Mai Service฿180M
620 SKUs
41% capacity

Stock Sentinel

Acting
Copper wire 3.2mmcritical
CU-WIRE-3.2MM·240 / min 800
Auto-PO drafted (Vendor: Sumitomo, 2T)
Bushing 24kV 630Alow
BUSH-24KV-630·38 / min 60
Transfer 25pc from WH-Chachoengsao
TX Oil Nytro 11GX 200L drumlow
OIL-NYTRO-200L·12 / min 24
Consolidate with next PO-9019
MC4 connector pairok
PV-CON-MC4·14200 / min 5000
Slow-mover — review pricing

Distribution Routes

Today · 14 outbound, AI-optimized

WH-Lat KrabangEGAT Mae Moh Sub-2
8 × Power TX 2500kVA
Optimized vs baseline: saved ฿38K · 4h
WH-ChachoengsaoPEA Khon Kaen
240 × RMU 24kV
Optimized vs baseline: saved ฿62K · 6h
WH-Surat ThaniBanpu SPP-08 site
120 × Solar combiner
Optimized vs baseline: saved ฿14K · 2h
WH-Chiang MaiField service · 12 sites
Multi-drop FSM kit
Optimized vs baseline: saved ฿24K · 3h